top of page

Final Report

This report covers the existing design of The Intersection Office Building, and details the proposal for an alternate structural system. The structural redesign proposal encompasses redesign of all structural members for gravity loads (beams, columns and floor system), as well as a lateral force resisting system redesign. The latter sections of this report provide a construction cost and schedule analysis and comparison between the existing structure and the new proposed structure, as well as investigating acoustical considerations for the floors.

A more comprehensive summary of results can be found in the Executive Summary in the link below.

Final Report

Executive Summary

Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work‐in progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Jared Warren. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.

News Feed

04/18/18 - CPEP Site Complete and Ready for Final Review

04/10/18 - Submitted Final Presentation

04/02/18 - Submitted Final Report

01/16/18 - Submitted Revised Proposal

12/08/17 - Submitted Proposal

11/17/17 - Submitted Breadth Topics

11/13/17 - Submitted Notebook C

10/23/17 - Submitted Abstract

10/18/17 - Submitted Building Statistics Pt. 2

10/16/17 - Submitted Notebook B Presentation

10/13/17 - Submitted Notebook B

10/02/17 - Submitted Building Statistics Pt. 1

09/25/17 - Submitted Notebook A

09/15/17 - Submitted Student Bio/About Me ; Submitted Advisor Meeting Notes

09/11/17 - Submitted Technical Report 1

09/03/17 - Obtained Project Specifications

09/02/17 - Sent Thank You letters and E-mails

09/01/17 - CPEP Home Page draft - Submitted Building Statistics Pt. 1 Draft

08/28/17 - Obtained Owner Permission; Obtained CD's

08/27/17 - Completed Master List Information

08/23/17 - Submitted Initiation Checklists

08/21/17 - Attended first CPEP Seminar/Lecture

bottom of page